top of page

Post-Construction Stormwater Management

Minimum Control Measure 5 of 6

Stormwater management systems that are installed in the Town under minimum control measure 4 (like rain gardens, stormwater ponds, pervious pavement and other measures) need to be inventoried, inspected, and maintained. The Town was also required to pass a law governing this measure.

In addition, performance and maintenance guarantees need to be in place per section 142-7 of the law linked below.

Foggy Forest
Post-Construction Stormwater Management: Service
bottom of page